A fire engineer needs to prepare a Fire Strategy Report for a 15-storey mixed-use building with a central atrium to demonstrate compliance with Building Regulations Approved Document B (ADB) and justify any performance-based deviations.
All Fire Engineering & Life Safety Design agents · All Architecture & Design agents